01 / Start with an exact sample brief
Provide the SKU or reference image, destination country, intended sales channel, quantity estimate and packaging preference. Identify the connection system and requested product version. A sample for evaluating the build may differ from a final retail-packed approval sample; state which decision you need to make before arranging it.
02 / Separate product review from packaging review
Review the supplied parts, fit, finished build, instructions and visible workmanship. Record any missing components or changes requested. Check the retail box separately: artwork, dimensions, language, barcode space and the contents shown on the pack. A product sample does not automatically approve artwork that was created later.
For a multi-model building-toy sample, build each advertised version from the supplied parts. Record whether parts are shared between models. For powered or pull-back models, check the moving feature separately from the static build.
03 / Match documents to the proposed item
Ask which documents are available for the specific model, materials and intended market. Check that product identification and scope match the version under review. A report for a different construction system or product should not be treated as evidence for this item. Resolve document gaps with the responsible specialist before committing to the order.
04 / Record approval and open points
Use dated photographs and a written reference covering the SKU, version, included parts, packaging and approved changes. Mark unresolved items rather than approving them by silence. Keep the approved reference available to both parties and agree how any later material, color, component or packaging change will be reviewed.
05 / Confirm the commercial next step
Sample charges, courier arrangements, availability and preparation time depend on the requested version. Confirm these in writing. Sample approval is not a purchase order: quantities, product pricing, delivery basis and inspection arrangements still need their own commercial agreement.
06 / How samples move out of the cluster
Chenghai runs on samples. International courier desks, packaging suppliers and factory sampling rooms operate around them daily, which keeps the physical part of this process fast: shortlisted items are collected from showrooms and workshops, consolidated, checked against the brief and dispatched together instead of arriving in four unrelated parcels. For pre-production samples tied to private-label work, the packaging proof and the built product travel as one package so the box, the instruction booklet and the contents can be approved against each other.
After more than ten years of export sampling, our standard practice is to keep a dated, sealed reference of the approved version on our side as well — the same photos, piece list and revision notes the buyer holds. When bulk production begins, the line is compared against that reference, and when a reorder arrives months later, the first question is answered in minutes: is this still the same approved building toy, or did something change?
